Supply of water work construction machinery for the Lower Danube Valley Water Directorate (ADUVIZIG), Hungary

Lower-Danube-vally Water Directorate

Supply of the following water work construction machinery for the Lower Danube Valley Water Directorate (ADUVIZIG), Hungary:
— mobile excavator (with knuckle boom), 1 pc,
— telescopic loader, 1 pc,
— self-powered amphibian tool carrier with different tools and accessories (for reed cutting), 1 pc,
— 4 x 4 tipper truck with hydraulic crane (GVW: 15 tons), 1 pc,
— 8 x 8 truck with fixed platform and hydraulic crane (GVW: 32 tons), 1 pc.

Határidő

Az ajánlatok beérkezésének határideje 2018-02-06. A közbeszerzést a következő honlapon tették közzé 2017-11-29.

Kicsoda? Mi az? Hol?
Beszerzési előzmények
Dátum Dokumentum
2017-11-29 Ajánlati felhívás
2017-12-06 További információk
Ajánlati felhívás (2017-11-29)
Objektum
A közbeszerzés hatálya
Cím: Mechanikus lapátos kotró, exkavátor és kanalas rakodó, valamint bányagépek
Mennyiség vagy érték:
— mobile excavator (with knuckle boom), 1 pc,— telescopic loader, 1 pc,— self-powered amphibian tool carrier with different tools and accessories (for reed cutting), 1 pc,— 4 x 4 tipper truck with hydraulic crane (GVW: 15 tons), 1 pc,— 8 x 8 truck with fixed platform and hydraulic crane (GVW: 32 tons), 1 pc.
Többet mutasson
Hirdetmény metaadatai
Eredeti nyelv: angol 🗣️
Dokumentum típusa: Ajánlati felhívás
Szerződés jellege: Árubeszerzések
Szabályozás: Európai Unió
Közös közbeszerzési szójegyzék (CPV)
Kód: Mechanikus lapátos kotró, exkavátor és kanalas rakodó, valamint bányagépek 📦

Eljárás
Eljárás típusa: Nyílt eljárás
Ajánlat típusa: Benyújtás egy vagy több tétel vonatkozásában
Díjazási kritériumok
A legalacsonyabb összegű ellenszolgáltatás

Ajánlatkérő hatóság
Azonosító
Ország: Magyarország 🇭🇺
Ajánlatkérő típusa: Minisztérium vagy egyéb nemzeti vagy szövetségi hatóság
Ajánlatkérő neve: Lower-Danube-vally Water Directorate
Postacím: Szécheny I. u. 2/c
Postai irányítószám: 6500
Postai város: Baja
Kapcsolat
Internetcím: http://www.aduvizig.hu/ 🌏

Hivatkozás
Dátumok
Feladás dátuma: 2017-11-29 📅
Benyújtási határidő: 2018-02-06 📅
Közzététel dátuma: 2017-11-30 📅
Azonosítók
Hirdetmény száma: 2017/S 230-480464
HL-S szám: 230
További információk
1. The rules of the tender procedure For this tender procedure the rules of the PRAG Practical Guide (Procurement And Grants for European Union external actions — A Practical Guide Applicable as of 15.1.2016) for international open supply tender procedures shall be applied. For full information about procurement procedures please consult the Practical Guide and its annexes, which can be downloaded from the following web page: http://ec.europa.eu/europeaid/prag/document.do 2. How to obtain the tender dossier: The tender dossier is available from the following Internet address: www.kozzetetel.mkbt.eu The tender dossier is also available from the Contracting Authority. Tenders must be submitted using the standard Tender Form for a Supply Contract included in the tender dossier, whose format and instructions must be strictly observed. Tenderers with questions regarding this tender should send them in writing to drmolnareva@mkbt.eu, H-1067 Budapest, Andrássy út 17. 2. emelet 10. (mentioning the publication reference shown in item 1) at least 21 days before the deadline for submission of tenders given in item 19. The Contracting Authority must reply to all tenderers' questions at least 11 days before the deadline for submission of tenders. Eventual clarifications or minor changes to the tender dossier shall be published at the latest 11 days before the submission deadline on the following website at www.kozzetetel.mkbt.eu 3. Number of tenders Tenderers may submit only one tender per lot. Tenders for parts of a lot will not be considered. Any tenderer may state in its tender that it would offer a discount in the event that its tender is accepted for more than one lot. Tenderers may not submit a tender for a variant solution in addition to their tender for the supplies required in the tender dossier. 4. Tender guarantee No tender guarantee is required. 5. Performance guarantee The successful tenderer will be asked to provide a performance guarantee of 5 % of the amount of the contract at the signing of the contract. This guarantee must be provided together with the return of the countersigned contract no later than 30 days after the tenderer receives the contract signed by the Contracting Authority. If the selected tenderer fails to provide such a guarantee within this period, the contract will be void and a new contract may be drawn up and sent to the tenderer which has submitted the next cheapest compliant tender. 6. Tender validity Tenders must remain valid for a period of 90 days after the deadline for submission of tenders. In exceptional circumstances, the Contracting Authority may, before the validity period expires, request that tenderers extend the validity of tenders for a specific period (see para 8.2 of the instructions to tenderers in the tender dossier). 7. Termination of the contract Taking into account the fact that payment of the contract is from the subsidy awarded for the implementation of the project ‘BABECA’, the Contracting Authority may terminate the contract, even after the Contractor has commenced performance if the EU contribution is withdrawn in full or is reduced in the extent that the implementation of the project becomes impossible or if any regulatory provision concerning the project prevents its execution. In this case, the Contracting Authority is obliged to disclose the reasons and justifications for the decision on terminating the contract in a written legal declaration with the Contractor. 8. Legal basis: Regulation (EU) No 231/2014 of the European Parliament and of the Council of 11.3.2014 establishing an Instrument for Pre-Accession Assistance (IPA II); Commission Implementing Regulation (EU) No 447/2014 of May 2014 on the specific rules for implementing Regulation (EU) No 231/2014 of the European Parliament and of the Council establishing an Instrument for Pre-accession assistance (IPA II) (hereinafter referred to as the IPA Implementing Regulation); Regulation (EU) N°236/2014 of the European Parliament and of the Council of 11.3.2014 laying down common rules and procedures for the implementation of the Union's instruments for financing external action. The European Commission's Decision C(2015) 9488 on 15.12.2015 which relies on the Regulation (EC) No 231/2014 of the European Parliament and of the Council and the Commission Implementing Regulation (EU) No 447/2014 (IPA II Implementing Regulation).
Többet mutasson

Objektum
A közbeszerzés hatálya
Rövid leírás:
Supply of the following water work construction machinery for the Lower Danube Valley Water Directorate (ADUVIZIG), Hungary:
— mobile excavator (with knuckle boom), 1 pc,
— telescopic loader, 1 pc,
— self-powered amphibian tool carrier with different tools and accessories (for reed cutting), 1 pc,
— 4 x 4 tipper truck with hydraulic crane (GVW: 15 tons), 1 pc,
— 8 x 8 truck with fixed platform and hydraulic crane (GVW: 32 tons), 1 pc.
A rész száma: 1
A rész elnevezése: Loader and excavator
Mennyiség vagy érték: — mobile excavator (with knuckle boom), 1 pc,— telescopic loader, 1 pc.
— mobile excavator (with knuckle boom), 1 pc,
— telescopic loader, 1 pc.
A rész száma: 2
A rész elnevezése: Amphibian tool carrier
Mennyiség vagy érték: — 4 x 4 tipper truck with hydraulic crane (GVW: 15 tons), 1 pc,— 8 x 8 truck with fixed platform and hydraulic crane (GVW: 32 tons), 1 pc.
— 4 x 4 tipper truck with hydraulic crane (GVW: 15 tons), 1 pc,
— 8 x 8 truck with fixed platform and hydraulic crane (GVW: 32 tons), 1 pc.
A rész száma: 3
A rész elnevezése: Trucks
Mennyiség vagy érték:
— telescopic loader, 1 pc,
— self-powered amphibian tool carrier with different tools and accessories (for reed cutting), 1 pc,
Az uniós finanszírozású projekt vagy program neve:
Interreg-IPA CBC Hungary-Serbia Programme: HUSRB/1601/11/0001 BABECA — The complex water management development of the area of the Baja-Bezdan Canal.
A teljesítés helye
Fő helyszín vagy teljesítési hely: Baja, Hungary.

Jogi, gazdasági, pénzügyi és műszaki információk
Részvételi feltételek
A szakmai tevékenység végzésére való alkalmasság:
Participation is open to all natural persons who are nationals of and legal persons (participating either individually or in a grouping — consortium — of tenderers) which are effectively established in a Member State of the European Union or in a eligible country or territory as defined under the Regulation (EU) N°236/2014 establishing common rules and procedures for the implementation of the Union's instruments for external action (CIR) for the applicable Instrument under which the contract is financed (see also point VI.3) 8. — Legal basis- below). Participation is also open to international organisations.
Többet mutasson
All supplies under this contract must originate in one or more of these countries.
Tenderers must submit a signed declaration, included in the Tender Form for a Supply Contract, to the effect that they are not in any of the situations listed in point 2.3.3 of the Practical Guide.
Gazdasági és pénzügyi helyzet:
Evaluation of Economic and financial capacity of tenderer is based on the data provided by the Tenderer under item 3 of the Tender Form. The successful tenderer will be asked to submit the proofs of his declarations as specified in the tender dossier.
Többet mutasson
Evaluation of Professional capacity of tenderer is based on the data provided by the Tenderer under item 4 and 5 of the Tender Form.
The successful tenderer will be asked to submit the proofs of his declarations as specified in the tender dossier.
Az alkalmasság minimumkövetelménye(i):
1) Economic and financial capacity of tenderer (based on i.a. item 3 of the Tender Form for a Supply Contract). In case of tenderer being a public body, equivalent information should be provided. The reference period which will be taken into account will be the last three years for which accounts have been closed.
Többet mutasson
The selection criteria for each tenderer are as follows:
Criteria for legal persons:
1 — The average annual turnover of the tenderer for the last 3 years for which accounts have been closed must exceed one and a half times the total value of its financial proposal for all of the lots tendered.
2 — Current ratio (current assets/current liabilities) in the last year for which accounts have been closed must be at least 1. In case of a consortium, this criterion must be fulfilled by each member.
Criteria for natural persons:
1 — The available financial resources of the tenderer must exceed one and a half times the total value of her/his financial proposal for all of the lots tendered.
2 — The financial situation of the tenderer should not be in deficit, taken into account debts, within the 12 months preceding the deadline for submission of the tenders in this procedure.
2) Professional capacity of tenderer (based on i.a. items 4 and 5 of the Tender Form for a Supply Contract).
1 — At least 2 staff currently employed and have been employed during the past 2 years on permanent basis for the tenderer in field of selling construction machines (either bidding for one or two or three lots).
1 — She/he is currently working and was working during the past 2 years as manager/team-leader or private entrepreneur in the field of selling construction machines (either bidding for one or both lots).
Capacity-providing entities
An economic operator may, where appropriate and for a particular contract, rely on the capacities of other entities, regardless of the legal nature of the links which it has with them. Some examples of when it may not be considered appropriate by the Contracting Authority are when the tender rely in majority on the capacities of other entities or when they rely on key criteria. If the tender rely on other entities it must prove to the Contracting Authority that it will have at its disposal the resources necessary for performance of the contract, for example by producing a commitment on the part of those entities to place those resources at its disposal. Such entities, for instance the parent company of the economic operator, must respect the same rules of eligibility and notably that of nationality, as the economic operator. Furthermore, the data for this third entity for the relevant selection criterion should be included in the tender in a separate document. Proof of the capacity will also have to be furnished when requested by the Contracting Authority.
Többet mutasson
With regard to technical and professional criteria, a tenderer may only rely on the capacities of other entities where the latter will perform the tasks for which these capacities are required.
With regard to economic and financial criteria, the entities upon whose capacity the tenderer relies, become jointly and severally liable for the performance of the contract.
Műszaki és szakmai képességek:
Evaluation of Technical capacity of tenderer of tenderer is based on the data provided by the Tenderer under item 5 and 6 of the Tender Form.
Az alkalmasság minimumkövetelménye(i):
The reference period which will be taken into account will be the last 3 years from submission deadline.
This means that the contract the tenderer refers to could have been started or completed at any time during the indicated period but it does not necessarily have to be started and completed during that period, nor implemented during the entire period. Tenderers are allowed to refer either to projects completed within the reference period (although started earlier) or to projects not yet completed. In the first case the project will be considered in its whole if proper evidence of performance is provided (statement or certificate from the entity which awarded the contract, final acceptance). In case of projects still on-going only the portion satisfactorily completed during the reference period will be taken into consideration. This portion will have to be supported by documentary evidence (similarly to projects completed) also detailing its value.
Többet mutasson
The tenderer has delivered supplies
— in case of Lot 1 under at least one contract with a budget of at least 285 000 EUR in supplying loaders and excavators which were implemented during the following period: 236thrd of JanuaryFebruary, 2015 — 23rd6th of JanuaryFebruary, 2018.
— in case of Lot 2 under at least one contract with a budget of at least 120 000 EUR in supplying amphibian tool carrier machinery which were implemented during the following period: 23rd of January6th of February, 2015 — 23rd of January6th of February, 2018.
Többet mutasson
— in case of Lot 3 under at least one contract with a budget of at least 330 000 EUR in supplying trucks which were implemented during the following period: 23rd of January6th of February, 2015 — 6.2.2018.
A szerződés teljesítése
Kauciók és garanciák:
The successful tenderer will be asked to provide a performance guarantee of 5 % of the amount of the contract at the signing of the contract. This guarantee must be provided together with the return of the countersigned contract no later than 30 days after the tenderer receives the contract signed by the Contracting Authority. If the selected tenderer fails to provide such a guarantee within this period, the contract will be void and a new contract may be drawn up and sent to the tenderer which has submitted the next cheapest compliant tender.
Többet mutasson

Eljárás
Az ajánlat érvényességi időtartama: 90 nap
Az ajánlatok bontásának dátuma: 2018-02-06 📅
A bontás helye: H-1061 Budapest, Andrássy út 17. 2nd floor, 10. Hungary
Hely: H-1061 Budapest, Andrássy út 17. 2nd floor, 10. Hungary
Adatok a felhatalmazott személyekről és a bontási eljárásról: Representatives of the contracting authority and the tenderers.
Nyelvek
Nyelv: angol 🗣️

Ajánlatkérő hatóság
Kapcsolat
Név: Első Magyar Közbeszerzési Tanácsadó Zrt.
Postacím: Andrássy út 17.
Postai város: Budapest
Postai irányítószám: 1061
Kapcsolattartó pont: Első Magyar Közbeszerzési Tanácsadó Zrt.
Ms Éva Molnár dr.
E-mail: drmolnareva@mkbt.eu 📧
Fax: +36 17930640 📠
URL további információkért: www.mkbt.eu 🌏
Dokumentumok URL-je: www.mkbt.eu 🌏
Postacím: Andrássy út 17. 2nd floor, 10.
Részvételi URL: www.mkbt.eu 🌏

Hivatkozás
Dátumok
Kezdeti időpont: 2018-04-03 📅
Végdátum: 2018-05-11 📅
2018-11-01 📅
További információk
1. The rules of the tender procedure
For this tender procedure the rules of the PRAG Practical Guide (Procurement And Grants for European Union external actions — A
Practical Guide Applicable as of 15.1.2016) for international open supply tender procedures shall be applied. For full information about procurement procedures please consult the Practical Guide and its annexes, which can be downloaded from the following web page: http://ec.europa.eu/europeaid/prag/document.do
Többet mutasson
2. How to obtain the tender dossier:
The tender dossier is available from the following Internet address: www.kozzetetel.mkbt.eu
The tender dossier is also available from the Contracting Authority. Tenders must be submitted using the standard Tender Form for a Supply Contract included in the tender dossier, whose format and instructions must be strictly observed.
Tenderers with questions regarding this tender should send them in writing to drmolnareva@mkbt.eu, H-1067 Budapest, Andrássy út 17. 2. emelet 10. (mentioning the publication reference shown in item 1) at least 21 days before the deadline for submission of tenders given in item 19. The Contracting Authority must reply to all tenderers' questions at least 11 days before the deadline for submission of tenders. Eventual clarifications or minor changes to the tender dossier shall be published at the latest 11 days before the submission deadline on the following website at www.kozzetetel.mkbt.eu
Többet mutasson
3. Number of tenders
Tenderers may submit only one tender per lot. Tenders for parts of a lot will not be considered. Any tenderer may state in its tender that it would offer a discount in the event that its tender is accepted for more than one lot. Tenderers may not submit a tender for a variant solution in addition to their tender for the supplies required in the tender dossier.
Többet mutasson
4. Tender guarantee
No tender guarantee is required.
5. Performance guarantee
The successful tenderer will be asked to provide a performance guarantee of 5 % of the amount of the contract at the signing of the contract. This guarantee must be provided together with the return of the countersigned contract no later than 30 days after the tenderer receives the contract signed by the Contracting Authority. If the selected tenderer fails to provide such a guarantee within this period, the contract will be void and a new contract may be drawn up and sent to the tenderer which has submitted the next cheapest compliant tender.
Többet mutasson
6. Tender validity
Tenders must remain valid for a period of 90 days after the deadline for submission of tenders. In exceptional circumstances, the Contracting Authority may, before the validity period expires, request that tenderers extend the validity of tenders for a specific period (see para 8.2 of the instructions to tenderers in the tender dossier).
Többet mutasson
7. Termination of the contract
Taking into account the fact that payment of the contract is from the subsidy awarded for the implementation of the project ‘BABECA’, the Contracting Authority may terminate the contract, even after the Contractor has commenced performance if the EU contribution is withdrawn in full or is reduced in the extent that the implementation of the project becomes impossible or if any regulatory provision concerning the project prevents its execution.
Többet mutasson
In this case, the Contracting Authority is obliged to disclose the reasons and justifications for the decision on terminating the contract in a written legal declaration with the Contractor.
8. Legal basis:
Regulation (EU) No 231/2014 of the European Parliament and of the Council of 11.3.2014 establishing an Instrument for Pre-Accession Assistance (IPA II);
Commission Implementing Regulation (EU) No 447/2014 of May 2014 on the specific rules for implementing Regulation (EU) No 231/2014 of the European Parliament and of the Council establishing an Instrument for Pre-accession assistance (IPA II) (hereinafter referred to as the IPA Implementing Regulation);
Többet mutasson
Regulation (EU) N°236/2014 of the European Parliament and of the Council of 11.3.2014 laying down common rules and procedures for the implementation of the Union's instruments for financing external action.
The European Commission's Decision C(2015) 9488 on 15.12.2015 which relies on the Regulation (EC) No 231/2014 of the European Parliament and of the Council and the Commission Implementing Regulation (EU) No 447/2014 (IPA II Implementing Regulation).
Forrás: OJS 2017/S 230-480464 (2017-11-29)
További információk (2017-12-06)
Objektum
Hirdetmény metaadatai
Dokumentum típusa: További információk

Hivatkozás
Dátumok
Feladás dátuma: 2017-12-06 📅
Közzététel dátuma: 2017-12-08 📅
Azonosítók
Hirdetmény száma: 2017/S 236-491396
Hirdetményre hivatkozik: 2017/S 230-480464
HL-S szám: 236
Forrás: OJS 2017/S 236-491396 (2017-12-06)